Test cases for Timer. May fail sometimes, for example if there is GC during the run. Therefore, if run
standalone, the likelyhood of GC is smaller than when run with the entire testsuite
author: Bela Ban
Tests whether retransmits are called at correct times for 1000 messages. A retransmit should not be
more than 30% earlier or later than the scheduled retransmission time