Date Calculation « Data Type « Java
Java
1.
2D Graphics GUI
2.
3D
3.
Advanced Graphics
4.
Ant
5.
Apache Common
6.
Chart
7.
Class
8.
Collections Data Structure
9.
Data Type
10.
Database SQL JDBC
11.
Design Pattern
12.
Development Class
13.
EJB3
14.
Email
15.
Event
16.
File Input Output
17.
Game
18.
Generics
19.
GWT
20.
Hibernate
21.
I18N
22.
J2EE
23.
J2ME
24.
JDK 6
25.
JNDI LDAP
26.
JPA
27.
JSP
28.
JSTL
29.
Language Basics
30.
Network Protocol
31.
PDF RTF
32.
Reflection
33.
Regular Expressions
34.
Scripting
35.
Security
36.
Servlets
37.
Spring
38.
Swing Components
39.
Swing JFC
40.
SWT JFace Eclipse
41.
Threads
42.
Tiny Application
43.
Velocity
44.
Web Services SOA
45.
XML
Java Tutorial
Java Source Code / Java Documentation
Java Open Source
Jar File Download
Java Articles
Java Products
Java by API
Photoshop Tutorials
Maya Tutorials
Flash Tutorials
3ds-Max Tutorials
Illustrator Tutorials
GIMP Tutorials
C# / C Sharp
C# / CSharp Tutorial
C# / CSharp Open Source
ASP.Net
ASP.NET Tutorial
JavaScript DHTML
JavaScript Tutorial
JavaScript Reference
HTML / CSS
HTML CSS Reference
C / ANSI-C
C Tutorial
C++
C++ Tutorial
Ruby
PHP
Python
Python Tutorial
Python Open Source
SQL Server / T-SQL
SQL Server / T-SQL Tutorial
Oracle PL / SQL
Oracle PL/SQL Tutorial
PostgreSQL
SQL / MySQL
MySQL Tutorial
VB.Net
VB.Net Tutorial
Flash / Flex / ActionScript
VBA / Excel / Access / Word
XML
XML Tutorial
Microsoft Office PowerPoint 2007 Tutorial
Microsoft Office Excel 2007 Tutorial
Microsoft Office Word 2007 Tutorial
Java
»
Data Type
»
Date Calculation
Screenshots
1.
Get the days difference
2.
Get the days passed from the specified date up to the date provided in the constructor
3.
Get the hours difference
4.
Get the minutes difference
5.
Get the seconds difference
6.
Adds a number of days to a date returning a new object.
7.
Adds a number of hours to a date returning a new object.
8.
Adds a number of milliseconds to a date returning a new object.
9.
Adds a number of minutes to a date returning a new object.
10.
Adds a number of months to a date returning a new object.
11.
Adds a number of seconds to a date returning a new object.
12.
Adds a number of weeks to a date returning a new object.
13.
Adds a number of years to a date returning a new object.
14.
Returns a Date set just to Noon, to the closest possible millisecond of the day.
15.
Returns a Date set to the first possible millisecond of the day, just after midnight.
16.
Returns a Date set to the first possible millisecond of the month, just after midnight.
17.
Returns a Date set to the last possible millisecond of the day, just before midnight.
18.
Returns a Date set to the last possible millisecond of the minute.
19.
Returns a Date set to the last possible millisecond of the month, just before midnight.
20.
Returns a java.sql.Timestamp equal to the current time
21.
Returns the number of days within the fragment.
22.
Returns the number of hours within the fragment.
23.
Returns the number of milliseconds within the fragment.
24.
Returns the number of minutes within the fragment.
25.
Returns the number of seconds within the fragment.
26.
Returns true if endDate is after startDate or if startDate equals endDate.
27.
Roll the days forward or backward
28.
Roll the java.sql.Date forward or backward
29.
Roll the java.util.Date forward or backward
30.
Roll the java.util.Time forward or backward
31.
Roll the years forward or backward
32.
Round this date, leaving the field specified as the most significant field.
33.
Checking date as String formatted by a date format
34.
Checks if a calendar date is after today and within a number of days in the future
35.
Checks if a calendar date is today
36.
Checks if a date is after today and within a number of days in the future
37.
Checks if the first calendar date is after the second calendar date ignoring time
38.
Checks if the first calendar date is before the second calendar date ignoring time
39.
Checks if the first date is after the second date ignoring time
40.
Checks if the first date is before the second date ignoring time
41.
Checks if two calendars represent the same day ignoring time
42.
Checks if two dates are on the same day ignoring time
43.
Checks the day, month and year are equal
44.
Checks the hour, minute and second are equal
45.
Make the date go forward of the specified amount of minutes
46.
Make the date go back of the specified amount of days
47.
Returns the maximum of two dates. A null date is treated as being less than any non-null date
48.
Utilities to working with dates java.util.Date
49.
Calculate Holidays
50.
Compare two dates
www.java2java.com
|
Contact Us
Copyright 2009 - 12 Demo Source and Support. All rights reserved.
All other trademarks are property of their respective owners.